• SME TE910143
Provide PDF Format

Learn More

SME TE910143

  • Planning And Implementing Quick Change Tooling Into Manufacturing
  • standard by Society of Manufacturing Engineers, 06/01/1991
  • Publisher: SME

$9.00$18.00


THE PLANNING REQUIRED TO CONVERT A SINGLE MACHINE TOOL TO QUICK CHANGE TOOLING SHOULD BE JUST AS INTENSIVE AS CONVERTING SEVERAL MACHINE TOOLS WITH DIFFERENT TOOLING PARAMETERS. EACH MACHINE TOOL BUILDER HAS HIS OR HER OWN UNIQUE SET OF TOOLING PARAMETERS. START WITH A THOROUGH STUDY OF EACH MACHINE TOOL. COMPILE A SPREAD SHEET OF SPECIFICATIONS. YOU WILL HAVE A BETTER UNDERSTANDING OF WHAT NEEDS TO BE ACCOMPLISHED. EVALUATE THE AVAILABLE QUICK CHANGE SYSTEMS. SELECT THE SYSTEM THAT MEETS YOUR REQUIREMENTS. TEST THE TOOLING BEFORE MAKING AN INVESTMENT. EVERYTHING STARTS WITH A PLAN. PLAN WELL AND THE RESULTS WILL BE REWARDING.

Related Products

SME MS900306

SME MS900306

Proposing A Flexible Manufacturing Cell To Management..

$9.00 $18.00

SME MR97-236

SME MR97-236

Diamond Wheel Specification And Ceramic Grinding..

$9.00 $18.00

SME MS900755

SME MS900755

Design For Manufacturing Use Of An Expert System..

$9.00 $18.00

SME ER930386

SME ER930386

A View Of The Twenty First Century For Manufacturing Engineering Technology..

$9.00 $18.00