• SME MS99-184
Provide PDF Format

Learn More

SME MS99-184

  • A "Gato" Algorithm For The Setup Planning Of Prismatic Parts
  • standard by Society of Manufacturing Engineers, 11/01/1999
  • Publisher: SME

$9.00$18.00


This paper introduces a GATO (Graph-Aided & Tolerance-Oriented) algorithm for the setup planning of prismatic parts in CAPP (Computer-Aided Process Planning). A tolerance graph concept with physical meaning is introduced, which makes directed graph theory suitably applied in setup planning. The impacts of both dimensional tolerances and geometrical tolerances in setup planning are analyzed. An examples is used to illustrate the algorithm.

Related Products

SME MS900306

SME MS900306

Proposing A Flexible Manufacturing Cell To Management..

$9.00 $18.00

SME MR97-236

SME MR97-236

Diamond Wheel Specification And Ceramic Grinding..

$9.00 $18.00

SME MS900755

SME MS900755

Design For Manufacturing Use Of An Expert System..

$9.00 $18.00

SME ER930386

SME ER930386

A View Of The Twenty First Century For Manufacturing Engineering Technology..

$9.00 $18.00