• SME MS95-114
Provide PDF Format

Learn More

SME MS95-114

  • Finite Capacity Scheduling For Fast Response
  • standard by Society of Manufacturing Engineers, 06/01/1995
  • Publisher: SME

$9.00$18.00


IN THIS PAPER, DIFFERENT SCHEDULING TECHNIQUES AND THEIR PROS AND CONS ARE EXAMINED. THE RELATIONSHIP BETWEEN MRP, INVENTORY MANAGEMENT, AND FINITE CAPACITY SCHEDULING IS ALSO PRESENTED. IT IS SHOWN THAT, MAXIMAL GAINS CAN ONLY BE OBTAINED IF THE FINITE CAPACITY SCHEDULING SYSTEMS ARE INSTALLED IN A WAY THAT ALL TYPES OF INVENTORY AS WELL AS MACHINES AND RESOURCES ARE SIMULTANEOUSLY TAKEN INTO ACCOUNT. FURTHERMORE, DIFFERENT SCENARIOS ARE PRESENTED OUTLINING THE DEPLOYMENT OF FINITE CAPACITY SCHEDULING SYSTEMS SO THE HIGHEST BENEFITS CAN BE OBTAINED FROM THE SYSTEM DEPLOYMENT. SOME OF THE PROCEDURAL AND CULTURAL ISSUES ARE ALSO ADDRESSED.

Related Products

SME MS910458

SME MS910458

An Introduction To Neural Networks With Applications To An Adaptive Pid Controller..

$9.00 $18.00

SME MS920152

SME MS920152

Selection Of Quick Die Change Toolholding And Power Sources..

$9.00 $18.00

SME MS900204

SME MS900204

The Use Of Expert Systems In Cnc Manufacturing..

$9.00 $18.00

SME MR98-238

SME MR98-238

Basic Study On Step Vibration Cutting..

$9.00 $18.00