• SME MS900344
Provide PDF Format

Learn More

SME MS900344

  • Planning For Shop Floor Systems
  • standard by Society of Manufacturing Engineers, 06/01/1990
  • Publisher: SME

$9.00$18.00


AN OVERALL STRATEGY CAN INTEGRATE A MANUFACTURING/ ENGINEERING FACILITY. ATTENTION IS GIVEN TO A BREAKOUT OF THE COSTS NECESSARY TO OPERATE EACH DEPARTMENT. DEPARTMENTS ARE DIVIDED INTO TWO AREAS: OPERATIONS AND OVERHEAD. THE OBJECT IS TO IDENTIFY HIGH COST OR LONG LEAD TIME ELEMENTS. ONCE THIS IS ACCOMPLISHED, COMPUTER TOOLS ARE INTEGRATED INTO THE PRESENT PROCESS TO REDUCE COSTS. THE PAPER DISCUSSES THE METHODOLOGY USED TO FIND THE HIGH-COST ITEMS AND PLANS TO ELIMINATE THE AREAS USING A COMMON SYSTEMS APPROACH.

Related Products

SME MS910332

SME MS910332

Optimal Design Of Planar Three Degrees Of Freedom Redundant Manipulator Using Iterative Orthoganal A..

$9.00 $18.00

SME MS96-141

SME MS96-141

Laser Shaping For Discontinuous Non-Circular Profiles..

$9.00 $18.00

SME MS910449

SME MS910449

Intelligent Gt; Manufacturability Easy..

$9.00 $18.00

SME ER96-237

SME ER96-237

A Curricular Model Of A Manufacturing Technology Programme In The Philippines..

$9.00 $18.00