• SME MM920125
Provide PDF Format

Learn More

SME MM920125

  • Can You Justify A New Slitting Line?
  • standard by Society of Manufacturing Engineers, 06/01/1992
  • Publisher: SME

$9.00$18.00


THE FINANCIAL JUSTIFICATION PROCEDURE FOR PURCHASING MAJOR CAPITAL EQUIPMENT IS PRESENTED. THE EXAMPLE USED IS FOR EVALUATING THE PURCHASE OF A SLITTING LINE FOR A TUBING PRODUCER. SPECIFICATIONS FOR THE INCOMING AND PRODUCT COILS ARE ANALYZED, AND FROM THAT ANALYSIS THE REQUIREMENTS FOR THE SLITTING LINE ARE ESTABLISHED. NEXT, TOTAL PROJECT COSTS ARE PREPARED AND COMPARED WITH THE PRICES OTHER FIRMS CHARGE FOR PERFORMING THE SAME WORK TO DETERMINE THE PROFIT POTENTIAL FOR THE NEW EQUIPMENT.

Related Products

SME FC95-261

SME FC95-261

How To Develop Effective Paint/Finishing Specifications..

$9.00 $18.00

SME EM920106

SME EM920106

Automation In Composite Manufacturing: The Lay-Up Process For Aeronautical Structures..

$9.00 $18.00

SME AD00-144

SME AD00-144

Torque Measuring Hand Tools..

$9.00 $18.00

SME MS900600

SME MS900600

Color Vision For Industrial Inspection..

$9.00 $18.00