• SME FC910262
Provide PDF Format

Learn More

SME FC910262

  • Planning For Automation
  • standard by Society of Manufacturing Engineers, 06/01/1991
  • Publisher: SME

$9.00$18.00


A STEP-BY-STEP DISCUSSION OF THE FACTORS TO BE CONSIDERED WHEN PLANNING TO AUTOMATE A PAINT PROCESS. THE FOLLOWING FACTORS ARE ADDRESSED: PRODUCTION REQUIREMENTS, ANALYSIS OF PART ARRAYS, PROCESS EVALUATIONS, QUALITY CONSIDERATIONS, EQUIPMENT JUSTIFICATION, AND ENVIRONMENTAL CONSIDERATIONS.

Related Products

SME ER98-306

SME ER98-306

Creating A Complete Environment For Excellence In Manufacturing Education..

$9.00 $18.00

SME MR00-198

SME MR00-198

Tool-Workpiece Interface In Orthogonal Cutting - Application Of Fem Modeling..

$9.00 $18.00

SME MS930418

SME MS930418

Application Of Continuous Flow Manufacturing In The Seminconductor Industry: Wafer Fabrication..

$9.00 $18.00

SME ER96-202

SME ER96-202

Integrated Design For Marketability And Manufacturing..

$9.00 $18.00