• SME FC900225
Provide PDF Format

Learn More

SME FC900225

  • Maximizing Control Of The Paint Pretreatment Process
  • standard by Society of Manufacturing Engineers, 06/01/1990
  • Publisher: SME

$9.00$18.00


TO GET OPTIMUM PERFORMANCE FROM ANY PAINT PRETREATMENT PROCESS, IT IS ESSENTIAL TO CONTROL ALL THREE COMPONENTS OF THE PROCESS. THESE ARE PRETREATMENT CHEMICAL QUALITY, THE PRETREATMENT PROCESS AND FINAL PAINTED PART QUALITY. THIS PAPER PRESENTS A CONCISE METHOD TO MANAGE ALL THREE CRITICAL COMPONENTS. A MECHANISM FOR CHECKING VENDOR CHEMICAL QUALITY IS PRESENTED. A PROCESS CONTROL PROGRAM FOR MONITORING THE PRETREATMENT PROCESS IS DISCUSSED. THIS WILL INCLUDE AN OVERVIEW REGARDING THE BENEFITS OF AUTOMATIC CONTROLLING SYSTEMS. FINALLY, A NOVEL APPROACH TO TESTING AND TRACKING FINAL PAINTED PART QUALITY IS EXAMINED. THE ENTIRE PRESENTATION IS AUGMENTED BY THE APPLICABILITY OF STATISTICAL PROCESS CONTROL IN EACH OF THE THREE CRITICAL AREAS.

Related Products

SME MS910458

SME MS910458

An Introduction To Neural Networks With Applications To An Adaptive Pid Controller..

$9.00 $18.00

SME MS920152

SME MS920152

Selection Of Quick Die Change Toolholding And Power Sources..

$9.00 $18.00

SME MS900204

SME MS900204

The Use Of Expert Systems In Cnc Manufacturing..

$9.00 $18.00

SME MR98-238

SME MR98-238

Basic Study On Step Vibration Cutting..

$9.00 $18.00