• SME AD910280
Provide PDF Format

Learn More

SME AD910280

  • Rapidly Establishing Statistical Process Control (Spc)
  • standard by Society of Manufacturing Engineers, 06/01/1991
  • Publisher: SME

$9.00$18.00


AFTER MANY YEARS OF STATISTICAL PROCESS CONTROL (SPC) TRAINING WITH VERY DISAPPOINTING RESULTS ON THE SHOP FLOOR, A SHIFT WAS MADE TO A USE IT OR LOSE IT PHILOSOPHY, CALLED THE 4RS (RIGHT TIME, RIGHT AMOUNT, RIGHT WAY, RIGHT SUPPORT). WITHIN EIGHT MONTHS, OPERATIONS WERE PLOTTING AND INTERPRETING SPC CHART DATA FOR OVER 80% OF NON-TESTER DATA POINTS ACROSS THE SUBJECT DIVISION. DURING THIS PERIOD, SPC PLANS WERE CREATED, OPERATORS AND ENGINEERING TEAMS WERE TRAINED, AND SPC CHARTS, COMPLETE WITH CONTROL LIMITS, WERE ESTABLISHED. TODAY, OPERATORS ARE IMPROVING PROCESSES AND ELIMINATING BOTH SPECIAL AND COMMON CAUSES OF VARIATION.

Related Products

SME MR930347

SME MR930347

Comparison Of Monocrystalline And Microcrystalline Cbn Abrasives In Grinding..

$9.00 $18.00

SME MS900775

SME MS900775

The Computer Made Me Do It..

$9.00 $18.00

SME FC99-124

SME FC99-124

True Controls Commonality For Paint Shop Automation..

$9.00 $18.00

SME ER900499

SME ER900499

The Computer-Integrated Enterprise At Fox Valley Technical College..

$9.00 $18.00