• SAE ARP5718A
Provide PDF Format

Learn More

SAE ARP5718A

  • Process to Obtain Holdover Times for Aircraft Deicing/Anti-Icing Fluids, SAE AMS1428 Types II, III, and IV
  • standard by SAE International, 11/01/2012
  • Publisher: SAE

$37.00$74.00


This document describes: a. the preparatory steps to test experimental Type II, III and IV fluids according to AMS1428; b. the recommendations for the preparation of samples for endurance time testing according to ARP5485; c. a short description of recommended field spray test; d. the protocol to generate draft holdover time guidelines from endurance time data as obtained from ARP5485; e. the protocol for inclusion of Type II, III, and IV fluids on the FAA and Transport Canada lists of fluids and the protocol for updating the lists of fluids; f. the role of the SAE G-12 Aircraft Deicing Fluids Subcommittee; g. the role of the SAE G-12 Holdover Time Committee; h. the process for the publication of Type II, III and IV holdover time guidelines.

This document does not describe laboratory testing procedures.

This document does not include the qualification process for AMS1424 Type I fluids.

Related Products

SAE J1645_201110

SAE J1645_201110

Fuel Systems and Components - Electrostatic Charge Mitigation..

$37.00 $74.00

SAE AS 9320

SAE AS 9320

Washer, Flat~AMS 6350 ( Reaffirmed: Oct 2003 Jun 2007 )..

$37.00 $74.00

SAE AS4877D

SAE AS4877D

Bolts and Screws, Nickel Alloy UNS N07718, Classification: 185 ksi/1200 °F, Procurement Specificati..

$37.00 $74.00

SAE J 2012

SAE J 2012

Diagnostic Trouble Code Definitions..

$37.00 $74.00