• PIP CVS02005
Provide PDF Format

Learn More

PIP CVS02005

  • Topographic and Plant Surveys Specification [Complete Revision]
  • standard by Process Industry Practices, 04/01/2016
  • Publisher: PIP

$75.00$150.00


This Practice provides the surveyor with requirements for providing adequate field data and information on natural features, existing facilities, above and underground utilities, site topography, and boundaries.

This Practice in conjunction with PIP CVS02005-F - Survey Checklist describes the requirements for quality control, permits, deliverables, and execution for topographic and plant surveys. In case of conflict, the Survey Checklist supersedes this Practice.

Related Products

PIP CVI02350

PIP CVI02350

Roadway and Area Paving General Notes and Typical Details [Complete Revision & Renumbering of C..

$363.00 $725.00

PIP PNSMV047

PIP PNSMV047

Plastic and Plastic-Lined Butterfly Valve Descriptions..

$50.00 $100.00

PIP PNC00005

PIP PNC00005

Design of ASME B31.3 Metallic Piping Systems [Complete Revision and Renumbering of PNE00001]..

$53.00 $105.00

PIP ELSBD01

PIP ELSBD01

Design and Fabrication of Metal-Enclosed Nonsegregated-Phase Bus Duct Assemblies [Complete Revision..

$50.00 $100.00