• AWWA WQTC69271
Provide PDF Format

Learn More

AWWA WQTC69271

  • The Challenge of Upgrading the Pittsburgh Water Treatment Plant Clearwell
  • Conference Proceeding by American Water Works Association, 11/01/2008
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by presentingproject objectives that include the following:meet Pittsburgh Water & Sewer Authority (PWSA) stated goals ofallowing existing clearwell to be taken out ofservice for maintenance, andtransporting water directly to Bruecken PumpStation; continue to supply high quality water during andafter construction; and,meet current and future regulatory requirements. Topics covered include the following: existing clearwell;clearwell improvement alternatives;increased utilization of existing system storage;rehabilitation of existing clearwell; evaluation of alternatives; conclusions and recommendations; and,implementation. Includes table, figures.

Related Products

AWWA WQTC50491

AWWA WQTC50491

Rapid Gravity Filter Backwash and Start-Up Strategies to Improve Filtered Water Quality: a Full Scal..

$12.00 $24.00

AWWA MTC61162

AWWA MTC61162

Reclamation of High TDS Effluent Using Microfiltration and Composite Membrane Reverse Osmosis..

$12.00 $24.00

AWWA JAW6663

AWWA JAW6663

Journal AWWA - Evaluating the Potential for Contaminating Drinking Water from the Corrosion of Tin-A..

$15.00 $30.00

AWWA MTC61185

AWWA MTC61185

Removal of Hormones by Nanofiltration: Effects of Hormone Concentration and Natural Organic Matter F..

$12.00 $24.00