• AWWA WQTC64168
Provide PDF Format

Learn More

AWWA WQTC64168

  • Take 2 at MPU: What a Difference 7 Years Made in the Design of Two Large-Scale Membrane Plants at Manitowoc Public Utilities
  • Conference Proceeding by American Water Works Association, 11/01/2006
  • Publisher: AWWA

$12.00$24.00


This slide presentation outlines a case study at the Manitowoc (Wisconsin) Public Utilities (MPU) concerning the design of two large-scale membrane treatment plants. The presentation outline includes: Background and History;Existing Membrane Facility at MPU;New Membrane Facility; and,Improvements Over Past Facilities. Conclusions indicate that:new 25 mgd submerged MF plant in Manitowoc willprovide existing and projected water needs for newlyformed Central Brown County Water Authority;existing microfiltration (MF) facility state-of-the-art in 1999, breakingnew ground in terms of cost and schedule;rapid changes in industry over last 7 years haveallowed for drastic improvements in cost, spacerequirements, and operability at new facility; and,as the industry continues to develop it provides newopportunities for utilities considering the use ofmembrane technologies.

Related Products

AWWA ACE70739

AWWA ACE70739

Public Involvement in the Internet Age: Understanding the Role of New and Social Media..

$12.00 $24.00

AWWA REUSE52104

AWWA REUSE52104

A Perspective on Water Reuse in Tehran Metropolitan Area..

$12.00 $24.00

AWWA 51765

AWWA 51765

Impact of Clarification and Adsorption Pretreatment on UF Operational Performance and Taste and Odor..

$12.00 $24.00

AWWA WQTC65955

AWWA WQTC65955

Impact of Magnetic Ion Exchange (MIEX) Resin on Floc Properties: A Pilot Plant Evaluation..

$12.00 $24.00