• AWWA SOURCES66544
Provide PDF Format

Learn More

AWWA SOURCES66544

  • Bringing a Regional Surface Water Supply Project from Concept to Reality
  • Conference Proceeding by American Water Works Association, 02/01/2008
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation presents a project thatdelivered treated Tuolumne River surfacewater (TID water rights),TID responsible for constructing andoperating the project thatwholesaled water to the California cities ofTurlock, Modesto, Hughson, and Ceres.Project drivers included groundwater quality anddrinking water standards, and project history is outlined. Current efforts include: Turlock approved first Drinking WaterAgreement in Oct. 2005, followed byCeres, Hughson, and Modesto; and,Design-Build contract includedwater treatment plants and pipelines. Requested flow rates, project operations, key components of regional water system, TID - infiltration gallery, raw water system, water treatment plant, pilot plant process design, finished water storage andpump station, water transmission, pipeline alignment, and city interconnections are all presented.

Related Products

AWWA WQTC55181

AWWA WQTC55181

Integral Optimization of C. Parvum Inactivation and Bromate Formation Control in Ozone Disinfection ..

$12.00 $24.00

AWWA JAW68590

AWWA JAW68590

Journal AWWA - How Not to Calibrate a Hydraulic Network Model..

$15.00 $30.00

AWWA JAW62652

AWWA JAW62652

Journal AWWA - AWWA's Annual Conference: A Compendium of Knowledge..

$15.00 $30.00

AWWA ACE71111

AWWA ACE71111

Small System Chlorination Review..

$12.00 $24.00