• AWWA SOURCES59168
Provide PDF Format

Learn More

AWWA SOURCES59168

  • Beijing Sustainable Water Resource Planning Case Study: An Integrated Plan for Yi-Zhuang Satellite Township
  • Conference Proceeding by American Water Works Association, 01/11/2004
  • Publisher: AWWA

$12.00$24.00


Faced with increasing water shortage challenges and uncertainties of future water supply, a Beijing-area township has taken an innovative approach to water supply sources. The township is developing a comprehensive integrated water resources plan that will achieve the goal of sustainable development for the township and the surrounding region through efficient use of water resources that are currently available and exploration of untapped sources with minimal environmental impact. Successful implementation of the plan is expected to greatly reduce or entirely eliminate the dependence of future supply upon water from the South-to-North-Transfer Project in the Yangtze River. Includes 8 references, tables.

Related Products

AWWA MTC53939

AWWA MTC53939

Evaluation of Three Pretreatment Processes on RO Membrane Performance on Reclaimed Water..

$12.00 $24.00

AWWA ACE71076

AWWA ACE71076

Investigations of Water Quality in Relation to LPHO Lamp Quartz Sleeve Fouling..

$12.00 $24.00

AWWA MTC69732

AWWA MTC69732

Simultaneous Control of Energy and Fouling in Submerged Microfiltration System..

$12.00 $24.00

AWWA WQTC69430

AWWA WQTC69430

Localized Treatment for Disinfection Byproducts..

$12.00 $24.00