• AWWA RSP64391
Provide PDF Format

Learn More

AWWA RSP64391

  • A Risk-Managed Approach to Averting PCCP Failure
  • Conference Proceeding by American Water Works Association, 03/01/2007
  • Publisher: AWWA

$12.00$24.00


This slide presentation begins with an outline of the City of Phoenix, Arizona's Large Water Main Assessment Program. It outlines the city of Phoenix's risk-managed approach to averting pre-stressed concrete cylinder pipe (PCCP) and covers topics that include: pipeline prioritization; elements of a risk assessment; likelihood factors ofinstallation date, waterway proximity and soil corrosivity; consequence factors ofpipeline diameter, adjacent land use, and proximity to railways and roadways; geographic information system (GIS)-Based Analysis; hydraulic modeling; Phoenix water model; demand, production, and evaluation of system impacts; and, PCCP Assessment Master Plan. Includes figures.

Related Products

AWWA ACE56186

AWWA ACE56186

Coagulation Changes for Future Regulations..

$12.00 $24.00

AWWA WQTC50507

AWWA WQTC50507

Cryptosporidium Removal Using a Pulsating Blanket Clarifier, Microsand Ballasted Clarifier, and Diss..

$12.00 $24.00

AWWA JAW65348

AWWA JAW65348

Journal AWWA - Water Beat -- Water News Roundup..

$15.00 $30.00

AWWA JAW64706

AWWA JAW64706

Journal AWWA - Filter-to-Waste Optimization..

$15.00 $30.00