• AWWA MTC64603
Provide PDF Format

Learn More

AWWA MTC64603

  • Integrating Disinfection Byproduct (DBP) Precursor Removal Prior to Microfiltration at Small Water Systems
  • Conference Proceeding by American Water Works Association, 03/01/2007
  • Publisher: AWWA

$12.00$24.00


Integrating precursor removal economically into an existing small microfiltration (MF) systemhas several challenges. Typically, budgets are limited, and integration must be made withexisting treatment processes. A case study is presented illustrating the options available fordisinfection byproduct (DBP) precursor removal in small MF systems and the engineering issuesthat must be faced for successful integration. Engineering design and operating results arepresented for a small Colorado MF system that recently solved a high DBP problem. Big ElkMeadows, a Community Water System, uses a 50 gpm pressurized MF system to treat waterwith dissolved organic carbon (DOC) between 9 to 13 mg/L. Distribution system Total Trihalomethanes (TTHMs) and haloacetic acids(HAA5) had tested more than 250 ug/L. After considering several options, magnetic ion exchange(MIEX®) was installed as pretreatment to the MF system. Following MIEX® installation,TTHMs and HAA5 dropped to below Stage 2 Disinfection Byproducts Rule (DBPR) limits. Includes 3 references, tables, figures.

Related Products

AWWA CSC92044

AWWA CSC92044

Geographic Information Systems Maps and Data for the Future Application to Water Distribution Networ..

$12.00 $24.00

AWWA MTC61108

AWWA MTC61108

From Source Water to Sludge: State-of-the-Art Technologies Used in the New Membrane Plant for the Ci..

$12.00 $24.00

AWWA JAW30406

AWWA JAW30406

Journal AWWA - Comparative Subchronic Toxicity of Chlorine and Monochloramine in the B6C3F1 Mouse..

$15.00 $30.00

AWWA ACE99408

AWWA ACE99408

Water Treatment in the Round: Use of Filtracone at a Small System..

$12.00 $24.00