• AWWA JAW58348
Provide PDF Format

Learn More

AWWA JAW58348

  • Journal AWWA - Reg Watch -- USEPA Readies to Finalize Delayed Rulemakings
  • Journal Article by American Water Works Association, 06/01/2003
  • Publisher: AWWA

$15.00$30.00


The US Environmental Protection Agency's (USEPA's) recent attention on implementing security initiatives and finalizing and implementing the revised arsenic standard has delayed progress on several other Safe Drinking Water Act (SDWA) rulemakings. This article reviews major rules and actions that have been proposed or will soon be proposed. Chief among them are proposals and preliminary determinations for the following rulemakings and related actions, which are considered priority rulemakings because they have statutory deadlines: Stage 2 D/DBPR and LT2ESWTR; Ground Water Rule; CCL regulatory determinations; six-year review of current regulations; radon rule; and, MTBE.

Related Products

AWWA CSC91062

AWWA CSC91062

Design of an Expert System on Water Well and Well Pump Maintenance..

$12.00 $24.00

AWWA DSS65647

AWWA DSS65647

The Integration of SPCS (aka SCADA)..

$12.00 $24.00

AWWA ACE56319

AWWA ACE56319

Tucson's Successful Re-Introduction of a Renewable Water Supply..

$12.00 $24.00

AWWA WQTC58788

AWWA WQTC58788

Assuring the Microbial Safety of Drinking Water..

$12.00 $24.00