• AWWA ACE93234
Provide PDF Format

Learn More

AWWA ACE93234

  • A Comparison of Implementation Alternatives for Control System Modernization Projects
  • Conference Proceeding by American Water Works Association, 01/01/1993
  • Publisher: AWWA

$12.00$24.00


The following important issues for implementing control system modernization projects are discussed in this paper, supported by case studies of actual projects: (1) control system modernization is now integral to long-range capital improvement planning for most utilities; (2) work elements unique to control system projects must occur in sequence; (3) design approaches offer considerable contracting flexibility and differ according to which project entity (contractor or consultant, for example) is responsible for the various design tasks; (4) design approaches have differing effects on owner satisfaction and cost; (5) the greatest impact of the procurement method is on owner satisfaction; (6) some design approach and procurement method combinations are more suitable for control system modernization projects than others.

Related Products

AWWA DSS71298

AWWA DSS71298

Distribution System Flushing: Meeting Stakeholder Expectations..

$12.00 $24.00

AWWA WQTC56947

AWWA WQTC56947

The Impact of Turbidity on Cryptosporidium and Giardia Inactivtion by Ultraviolet Light..

$12.00 $24.00

AWWA JAW31538

AWWA JAW31538

Journal AWWA - From Conventional to Biological Removal of Iron and Manganese in France..

$15.00 $30.00

AWWA WQTC71442

AWWA WQTC71442

Microbial Contamination and Climate Change: Examples from Recent Floods..

$12.00 $24.00