• AWWA ACE93199
Provide PDF Format

Learn More

AWWA ACE93199

  • Pilot Testing for Membrane System Design
  • Conference Proceeding by American Water Works Association, 01/01/1993
  • Publisher: AWWA

$12.00$24.00


Pilot tests can be divided into two categories depending on the degree of process development. Development tests help create process designs. Demonstration tests validate existing designs. In membrane tests, the critical parameters are: feedwater source (well, surface, waste), feedwater chemical makeup, pretreatment process and conditions, recovery, membrane geometry, and flow velocities. Two case histories illustrate requirements of pilot plants and the potential for disaster in relying on invalid test results. The first is an ultrafiltration system that is part of a wastewater treatment plant, and the second is a waste water recovery system for a metals finishing plant.

Related Products

AWWA DSS71298

AWWA DSS71298

Distribution System Flushing: Meeting Stakeholder Expectations..

$12.00 $24.00

AWWA WQTC56947

AWWA WQTC56947

The Impact of Turbidity on Cryptosporidium and Giardia Inactivtion by Ultraviolet Light..

$12.00 $24.00

AWWA JAW31538

AWWA JAW31538

Journal AWWA - From Conventional to Biological Removal of Iron and Manganese in France..

$15.00 $30.00

AWWA WQTC71442

AWWA WQTC71442

Microbial Contamination and Climate Change: Examples from Recent Floods..

$12.00 $24.00