• AWWA ACE92231
Provide PDF Format

Learn More

AWWA ACE92231

  • Pumping System Optimization for Energy Conservation at the City of Tampa, Florida
  • Conference Proceeding by American Water Works Association, 01/01/1992
  • Publisher: AWWA

$12.00$24.00


As part of the initial phase of the energy efficiency program for the City of Tampa, a feasibility study of potential pumping system modification at the Hillsborough River Water Treatment Plant (HRWTP) was performed. The feasibility study had the following major objectives: determine the optimum short-term means of operating the existing pumping system at the water treatment plant; determine the most cost-effective, long-term means to power and operate the pumping units; describe in detail the facilities needed to convert to the recommended method of operation; and provide a cost estimate of the proposed facilities, and recommend an implementation schedule. By working to improve the efficiency of the two major pumping systems, the city has taken steps to reduce the effect of continuously increasing energy costs. The Tampa high-service pump modifications and evaluation results are dramatic evidence that regularly scheduled, detailed pump evaluations can save municipal water systems substantial energy costs, assure maximum efficiency and provide rapid cost recovery from improvements to pumping system efficiency.

Related Products

AWWA JAW6784

AWWA JAW6784

Journal AWWA - Obtaining an Analytical Grasp of Water Distribution Systems ..

$15.00 $30.00

AWWA 65217

AWWA 65217

Safety First: Elevated Work Surfaces / Fall Protection..

$70.00 $140.00

AWWA JTMGT69635

AWWA JTMGT69635

'Round These Parts There's Only One Sheriff: Succession Planning the Greenville Way..

$12.00 $24.00

AWWA JTMGT57457

AWWA JTMGT57457

Knowledge Preservation for Tomorrow's Utility: The Utility Business and It's Unique Requirements..

$12.00 $24.00