• AWWA ACE92195
Provide PDF Format

Learn More

AWWA ACE92195

  • Raw Water Supply Development for a Membrane Treatment Facility in Collier County, Florida
  • Conference Proceeding by American Water Works Association, 01/01/1992
  • Publisher: AWWA

$12.00$24.00


A rapid increase in demand has placed continuous pressure to expand the wellfield in Collier County, Florida. A large quantity of freshwater is available from the Lower Tamiami Aquifer in the Golden Gate Estates areas. The physical availability of the water supply would be more than sufficient to meet future potable water demands for several decades into the future, but new environmental regulations and water quality problems have placed limitations on future wellfield expansions. Although the aquifer is semi-confined by clay beds occurring both above and below the aquifer, there is concern that leakage of water from the overlying water-table aquifer will cause unnatural and significant declines in the position of the water-table and surface water levels. These environmental concerns necessitated the development of a large scale, three-dimensional groundwater flow model of the area to be used in the design of the wellfield and in predicting aquifer pressure under various hydrologic conditions.

Related Products

AWWA 51847

AWWA 51847

Put Your Hydraulic Model to Work--How That Costly Model Can Earn its Keep by Making Operations More ..

$12.00 $24.00

AWWA SOURCES55626

AWWA SOURCES55626

Water Savings and Beyond: A Multi-Resource Conservation Collaboration at the Seattle School District..

$12.00 $24.00

AWWA WQTC58780

AWWA WQTC58780

Methods for Emerging Contaminant Groups: Explosives and Nitrosamines..

$12.00 $24.00

AWWA ACE65489

AWWA ACE65489

How to Construct the World's Largest Prestressed Concrete Tank: 40.0 MG Twin Oaks #2 Reservoir..

$12.00 $24.00