• AWWA ACE92152
Provide PDF Format

Learn More

AWWA ACE92152

  • Operational and Water Quality Problems Associated With CT Compliance
  • Conference Proceeding by American Water Works Association, 01/01/1992
  • Publisher: AWWA

$12.00$24.00


Planning for the implementation of disinfection requirements at the South Central Connecticut Regional WaterAuthority's (RWA) three treatment facilities has been an interesting if not frustrating case study. The Lake Saltonstall Water Treatment Plant (WTP) proved to be the easiest facility to bring into compliance by simply elevating the prechlorine dose. The West River WTP was somewhat more challenging as the existing filtered water reservoirs (FWRs) needed to be modified to enhance their hydraulic flow characteristics. Installing a single vertical baffle wall in both FWRs was sufficient to provide the required level of disinfection. The Lake Gaillard WTP was the most challenging facility in terms of upgrading disinfection. Attempts to introduce several variations of prechlorination have resulted in a myriad of physical and chemical problems. Additionally, the elevated levels of THMs resulting from this process change are still being evaluated.

Related Products

AWWA JAW39268

AWWA JAW39268

Journal AWWA - Computer-Generated Optimal Pumping Schedule..

$15.00 $30.00

AWWA WQTC55162

AWWA WQTC55162

Use of a Chemical Sensor Array and an On-Line Flow-Cell for Monitoring Water Quality..

$12.00 $24.00

AWWA ACE68675

AWWA ACE68675

Case Study: GAC Contactors for TOC Removal and Compliance with the Stage I Disinfectants and DBP Rul..

$12.00 $24.00

AWWA ACE54396

AWWA ACE54396

"Best-In-Class" Utility Requires Continual Commitment to Training and Education..

$12.00 $24.00