• AWWA ACE90071
Provide PDF Format

Learn More

AWWA ACE90071

  • Improved Efficiency Through Reduced Crew Size
  • Conference Proceeding by American Water Works Association, 01/01/1990
  • Publisher: AWWA

$12.00$24.00


This paper describes how Houston sized, organized and equipped its work crews to increase productivity. In 1984-1985, the 5,000 mile water distribution system generated about 500 annual failures per 100 miles, with thousands of repairs backlogged. Two hundred calls a day were not uncommon. The backlog was dramatically controlled in 1986 and beyond, using methods described in this paper. Crews were reorganized by combining water and wastewater organizations, downsizing the crew and fleet, and replacing paper work orders with a radio controlled system for improved flexibility. Crews were reorganized for agility; in the past, every crew comprised two to six workers, and every truck carried all of the equipment that might be needed for any type job--including a backhoe! After reorganizing workers into one to three man crews, area supervisors combined crews for big jobs and dispatched roving parts trucks to answer unusual calls. Excavation safety was emphasized, and a safety cage is now carried with most backhoes. By downsizing and reorganizing individual crews, the utility was able to double the total number of crews and therefore the number of jobs being worked simultaneously. In 1989, more than 170,000 work orders were completed.

Related Products

AWWA MTC61150

AWWA MTC61150

Trace Organic Contaminant Removal by Nanofiltration: From Pilot Plant to Full Scale..

$12.00 $24.00

AWWA WQTC52883

AWWA WQTC52883

Elimination of Acid Injection in Reverse Osmosis Plants..

$12.00 $24.00

AWWA ACE61858

AWWA ACE61858

Designing the First Membrane Treatment Facility for Florida's Largest Water Utility..

$12.00 $24.00

AWWA MTC64499

AWWA MTC64499

Assessment of Bench- and Pilot-Scale Fouling of Low-Pressure Membranes by NOM Using a Unified Modifi..

$12.00 $24.00