• AWWA ACE71093
Provide PDF Format

Learn More

AWWA ACE71093

  • Simultaneous Compliance with Stage 2 DBPR and the Lead and Copper Rule: A Road Map
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of soluble and particulate corrosion. A study is presented of balancing disinfectant residual withthe Lead and Copper Rule at Dartmouth, Massachusetts. Well sources were treated by greensand filtration, chlorine was added as a residual disinfectant in distributionsystem and no phosphate inhibitor was used, just pH adjustment. Water was purchased from New Bedford, MA, in summer periods. New Bedford used chloramines as residualdisinfectant. Regulatory issues faced by Dartmouth are presented, along with scale on the interior of the pipe and the influence of residual disinfectant on the scale. Methodology included small scale test simulation of pipe loop, coupon test, and performing scale analysis on existing pipe. Includes table, figures.

Related Products

AWWA JAW21569

AWWA JAW21569

Journal AWWA - Seattle's Experience With Distribution System Sampling ..

$15.00 $30.00

AWWA ACE54425

AWWA ACE54425

New Analytical Tools for Distribution System Surveillance..

$12.00 $24.00

AWWA ACE61695

AWWA ACE61695

Seattle Maximizes Its Security Investment with a Prudent, Yet Reasonable, Master Plan..

$12.00 $24.00

AWWA WQTC58914

AWWA WQTC58914

Managing Conversion to Chloramines..

$12.00 $24.00