• AWWA ACE70919
Provide PDF Format

Learn More

AWWA ACE70919

  • Minimizing Distribution System Annual O&M Costs and Improving Water Quality through Creative Finished Water Pump Scheduling
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of treatment plants and water storage in the Norfolk/Virginia Beach area of Virginia. Study objectives included: maximize pumping efficiency by optimizing pumping schedule during high demand hours, including reducing pump start frequency to reduce O&M cost andextending the life of the existing pumping facilities; and,reducing residence time in the storage tanks toimprove overall water quality. Study approach included the following: Extended Period Simulation (EPS) Hydraulic ModelDevelopment;Demand Patterns Development;Evaluation of System-wide Storage Capacity;Development of Optimized Operational Schedule; and,Verifications of Optimized Operating Schedule. Includes tables, figures.

Related Products

AWWA ACE71117

AWWA ACE71117

Benchmarking: a New Framework for Our Industry..

$12.00 $24.00

AWWA JAW10362

AWWA JAW10362

Journal AWWA - Financing Water Utility Improvements ..

$15.00 $30.00

AWWA IMT61455

AWWA IMT61455

Megabit Mobile Wireless Utility Computing - Why Not?..

$12.00 $24.00

AWWA ACE61659

AWWA ACE61659

HAA Formation During Chloramination..

$12.00 $24.00