• AWWA ACE70841
Provide PDF Format

Learn More

AWWA ACE70841

  • Cost of Compliance: Financial Impacts of Meeting the Radionuclides Rule for Over 30 Systems in Colorado
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of the CO-RADS goals:offer compliance and technical assistance tocommunities struggling to comply with theRadionuclides Rule at no cost to the systems; andultimately, help water systems resolveradionuclides violations. Malcolm Pirnie's scope of work is presented, along with the key project objective of developing 33 system-specificpreliminary engineering reports to help identify acompliance alternative. Compliance challenges and other water quality challenges are presented, along with compliance options, a list of small system compliance technologies for radionuclides and limitations of use, evaluation criteria andweightings, AACE cost estimate classifications, example of an uranium system, impact on CO-RADS systems, current status of CO-RADS, Colorado Department of Public Health and Environment position, external movement, and value of CO-RADS reports. Includes tables, figures.

Related Products

AWWA WQTC69418

AWWA WQTC69418

Evaluation of Two PCR-Based Swine-Specific Fecal Source Tracking Assays..

$12.00 $24.00

AWWA WQTC69317

AWWA WQTC69317

Use of Advanced NOM Characterization Methods to Trace the Fate of Organic Contaminants from a Membra..

$12.00 $24.00

AWWA WQTC69308

AWWA WQTC69308

An Analysis of Security Monitoring Data for Detection of Operational Problems..

$12.00 $24.00

AWWA CSC95037

AWWA CSC95037

On-Line Monitoring: The Application of Automatic Loop-Tuning Software at Water Treatment Plant..

$12.00 $24.00