• AWWA ACE70758
Provide PDF Format

Learn More

AWWA ACE70758

  • Cost-effective Stage 2 D/DBPR Compliance Options
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of Stage 2 TTHM and HAA5 limits. Disinfection byproduct (DBPs) formation is outlined, along with an overview of options to lower DBP concentrations. Conclusions on DBP optimization: select a conservative goal; evaluate existing conditions; optimize existing facilities for low costcompliance; determine if probability of compliance isacceptable or if improvements are needed usinga safety factor; evaluate options to meet targets throughdesktop, bench and/or pilot tests; and, perform cost-effective analysis of alternativesand implement the solutions. Includes table, figures.

Related Products

AWWA WSC69995

AWWA WSC69995

Emergency Water Supply: Developing a National Strategic Plan..

$12.00 $24.00

AWWA JAW39314

AWWA JAW39314

Journal AWWA - Package Plants for Small Systems: A Field Study..

$15.00 $30.00

AWWA ACE70650

AWWA ACE70650

Arsenic Removal with Iron Tailored Activated Carbon Coupled with Zero Valent Iron and Electrolytic C..

$12.00 $24.00

AWWA ACE70815

AWWA ACE70815

Bright Concepts to Offset Energy-Intensive Advanced Water Treatment Technologies..

$12.00 $24.00