• AWWA ACE70755
Provide PDF Format

Learn More

AWWA ACE70755

  • Potable Water System Improvements for Remote Pumping Plants
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of the Central Arizona Project (CAP) and the eight pumping plants that were too remoteto economically connect to apublic water system. Project objective was to install a small package treatmentsystem in each of the eight pumping plants to treat rawColorado River (canal) water to potable standards, andconnect to each plant's existing domestic water system. System demands and water quality characteristics are presented, along with treatment and operational objectives, technology selection, disinfection byproduct (DBP) formation control, package ultrafiltration (UF) systems, and a comparison of UF membrane package systems are all presented. Includes tables, figures.

Related Products

AWWA MTC69730

AWWA MTC69730

Operation at Yucaipa Valley Regional Water Filtration Facility..

$12.00 $24.00

AWWA ACE54347

AWWA ACE54347

Arsenic and Old Soils: Arsenic Geochemistry in the Western United States..

$12.00 $24.00

AWWA ACE62990

AWWA ACE62990

Overview of Infrastructure Asset Management and Risk Based Approaches in Investment Decisions: A Vie..

$12.00 $24.00

AWWA WQTC60548

AWWA WQTC60548

The Detection of Blue-Green Algal Toxins and Taste and Odor Compounds in Water Using DNA Based Techn..

$12.00 $24.00