• AWWA ACE70710
Provide PDF Format

Learn More

AWWA ACE70710

  • Modifying Work Processes to Optimize Use of Available Staffing
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


The powerpoint presentation begins by providing a brief overview of the traditional water utility approach to organization and risks to adequacy of employeeknowledge and skill. The organizational structure for the new Seymour-Capilano Filtration Plant at the Metro Vancouver Water Treatment System is presented, and represents: a new plant built with highly automated, less-attended design philosophy; an opportunity to standardize job duties and flatten structure to simplify shift schedule; and, offers benefits for staff including flexibility, variety, opportunities for advancement and time for training. The training program for the new plant is outlined, along with the Neural Network Modeling Tooland Expert Systems Tools, and the J.D. Phillips North Reclamation Facility in Colorado Springs, Colorado. Includes table.

Related Products

AWWA WQTC55181

AWWA WQTC55181

Integral Optimization of C. Parvum Inactivation and Bromate Formation Control in Ozone Disinfection ..

$12.00 $24.00

AWWA JAW68590

AWWA JAW68590

Journal AWWA - How Not to Calibrate a Hydraulic Network Model..

$15.00 $30.00

AWWA JAW62652

AWWA JAW62652

Journal AWWA - AWWA's Annual Conference: A Compendium of Knowledge..

$15.00 $30.00

AWWA ACE71111

AWWA ACE71111

Small System Chlorination Review..

$12.00 $24.00