• AWWA ACE70483
Provide PDF Format

Learn More

AWWA ACE70483

  • Frontline Responses to Treatment Plant Optimization: Experiences from the City of Houston's East Water Purification Plant
  • Conference Proceeding by American Water Works Association, 11/01/2009
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation discusses a project at the City of Houston's (Texas) East Water Purification Plant (EWPP) called the Treatment Optimization and Support Project(TOSP). It was initiated in 2008 as amulti-year project for theoptimization ofsurface water plants,groundwater plants, re-pump stations, and thedistribution system. Project goals were toreduce chemical/energy costs, andmaintain superior water quality. Key drivers for the study are provided, along with a brief overview of Houston's EWPP, a comprehensive performance evaluation (CPE), and performance limiting factors (PLFs). Includes tables, figures.

Related Products

AWWA WQTC62412

AWWA WQTC62412

Verification of a NF Retention Model for Organic Contaminants in Drinking Water Sources..

$12.00 $24.00

AWWA IMTECH62891

AWWA IMTECH62891

Effective IT Budgeting..

$12.00 $24.00

AWWA IMTECH59643

AWWA IMTECH59643

SCADA Challenges - Achieving Query and Reporting Capabilities for Non-Technical End Users..

$12.00 $24.00

AWWA ACE92147

AWWA ACE92147

Dual Flush Devices for Water Closets A Water Conservation Approach..

$12.00 $24.00