• AWWA ACE69003
Provide PDF Format

Learn More

AWWA ACE69003

  • LT2ESWTR Compliance for the Fallbrook PUD Red Mountain Reservoir
  • Conference Proceeding by American Water Works Association, 11/01/2008
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by presenting a brief overview of the LT2ESWTR as a regulatory driver: concerned with uncoveredfinished water reservoir provisions;separate from "Toolbox";"Inactivation and/or Removal"; and,enabling technology - UV. Process options are presented, along withphysical setting,system hydraulics,water quality,equipment pre-selection, andfacility design. Presentation conclusions indicate the following:UV/Cl2/NH2Cl system received conditionalapproval;health official(s) input attechnology/approach screening, validationworkshop, 30%, 60%, and 90% design;system sized for future flow and waterquality challenges;successful pre-selection;project going to bid in late-2008; and,construction and start-up in 2009. Includes tables, figures.

Related Products

AWWA MTC53689

AWWA MTC53689

Predicting Membrane System Water Quality Using an Integrated Diffusion Model..

$12.00 $24.00

AWWA ACE70685

AWWA ACE70685

Excellence, Service and Leadership: Foundations for a Career in Water Quality Research..

$12.00 $24.00

AWWA ACE93046

AWWA ACE93046

Involving the Neighborhood Before Concerns Arise: You and Your Citizens: Partners for Success..

$12.00 $24.00

AWWA WSC67779

AWWA WSC67779

Case Study to Evaluate Potential Response Options to an Intentional Contamination Event Using an Opt..

$12.00 $24.00