• AWWA ACE68983
Provide PDF Format

Learn More

AWWA ACE68983

  • Evaluation of On-Site Water Resources for the Redevelopment of South Weymouth Naval Air Station
  • Conference Proceeding by American Water Works Association, 11/01/2008
  • Publisher: AWWA

$12.00$24.00


This poster presentation provides a brief project overview that includes the following: South Weymouth Naval Air Station, 1,450 acre base closed in 1997 and amixed-use redevelopment will include 2,800 residential unitsand 2 million square feet of commercial and light industrial space;anticipated water demands includepotable water demand at full buildout = 1.4 MGD, andirrigation water demand for golf course = 0.3 to 0.45 MGD. A Pumping test included the following: well was pumped for six days;well was shut down without stabilization;data sources during test were from39 test wells,16 drive points (11 in wetlands, 5 in stream), and3 stream flow monitoring points. A groundwater model included the following:Transient VisualMODFLOW model;modeling period was4,500 hours, or 180days of continuouspumping;no surface rechargeto simulate worst-casepumping conditions; and,model calibrated towithin 0.72 feet ofobserved water levels. Conclusions:well is not suitable for potable water supply,limited recharge andpoor water quality;pumping impacts included stream - minimal,wetlands - some drawdown near well,clean-up sites - no impact, andwell is suitable for irrigation use.

Related Products

AWWA ACE56268

AWWA ACE56268

A Review of the Carcinogenicity of Chromate in Drinking Water..

$12.00 $24.00

AWWA ACE70756

AWWA ACE70756

Engineering Design of Water Treatment Process Units for Small Flows..

$12.00 $24.00

AWWA ACE61753

AWWA ACE61753

Asset Valuation Strategies - A Practical Example..

$12.00 $24.00

AWWA ACE70752

AWWA ACE70752

Case Study: Making a Water Reuse System Design Work..

$12.00 $24.00