• AWWA ACE68883
Provide PDF Format

Learn More

AWWA ACE68883

  • Creating a Valve Maintenance Program Using Existing Resources
  • Conference Proceeding by American Water Works Association, 11/01/2008
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing the goals of a valve maintenance program that include the following: exercise all valves 16" and larger, or at a criticallocation, once every year; and,exercise all other included valves at least onceevery five years. Information goals include: verify location;if closed, is it supposed to be;does it open to the right or left;how many turns;when was it last exercised; and,be able to print report of valves that need to beexercised during the next month. Topics presented include: valve inventory; types of valves; classification; history of valve maintenance; current challenges, opportunities and resources; solution; valve tag; benefits; biggest challenge; and, learning mode. Includes tables, figures.

Related Products

AWWA ACE91023

AWWA ACE91023

T10 Determinations in a Variety of Clearwells and Standpipes Using Fluoride as a Tracer..

$12.00 $24.00

AWWA DSS60349

AWWA DSS60349

Desk-Top Analysis of Blending an Undisinfected Groundwater with Treated Surface Water..

$12.00 $24.00

AWWA ACE54421

AWWA ACE54421

Self Evaluation and Capacity Development in Small Systems..

$12.00 $24.00

AWWA IMTECH64737

AWWA IMTECH64737

Case Study: Developing a GIS Data Set for Pipeline Prioritization and Replacement, Dallas Water Util..

$12.00 $24.00