• AWWA ACE68798
Provide PDF Format

Learn More

AWWA ACE68798

  • Pipe Life and Renewal Prioritization: Asset Management Practices
  • Conference Proceeding by American Water Works Association, 11/01/2008
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing a brief overview of asset management. Evaluation of pipe life cycle /probability of failure is presented, along withpipe performance / riskcriteria, andprioritization and decisionmaking. The benefits of the main replacement project planning approach include the following:provides an auditable approach tomains renewal;calibrated to match distributionsystem;configured to represent criticaldrivers for renewal decisions;easily enhanced as driverschange or more data becomesavailable; and,financial savings in renewal coststhrough project planning and byoptimizing renewal efforts. Includes figures.

Related Products

AWWA ACE94262

AWWA ACE94262

Contamination in Rural America - A Case Study..

$12.00 $24.00

AWWA ACE99557

AWWA ACE99557

Better Disinfection Through Optimized Clearwells..

$12.00 $24.00

AWWA WQTC71618

AWWA WQTC71618

Halate Formation from UV/Chlorine Process in the Presence of Bromide..

$12.00 $24.00

AWWA CSC91053

AWWA CSC91053

Three Dimensional Graphics in Distribution System Modeling..

$12.00 $24.00