Provide PDF Format
AWWA ACE68605
- From Chaos to Crisis to Kumbaya
- Conference Proceeding by American Water Works Association, 11/01/2008
- Publisher: AWWA
$12.00$24.00
This powerpoint presentation presents Alternate Project Delivery (APD) methods which were developedto address weaknesses in the traditional design-bid-build(D-B-B) delivery method. Advantages of APD methods are provided, along with APD challenges, APD contact information, and increased owner control.
Related Products
AWWA 51558
The Fundamentals and Practical Impacts of Bubble Formation in Water Treatment..
$12.00 $24.00