• AWWA ACE65368
Provide PDF Format

Learn More

AWWA ACE65368

  • Cutting Your Costs and Losses in Water System Planning: Fort Ethan Allen Pump Station Upgrade
  • Conference Proceeding by American Water Works Association, 06/01/2007
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation begins by providing background information on Arlington County, Virginia, and the Fort Ethan Allen Pump Station. Key project objectives included:Increase Transmission Capacity into ArlingtonCounty's Minor Hill Reservoir from theDalecarlia WTP;the Additional Capacity to Meet GrowthDemands through Buildout;provide additional Fire Flow Capacity toWilliamsburg Middle School, 5,000 gpd Design Flow; and,increase Water Transmission Capacity to MinorHill Reservoir from 9 MGD to Approximately 14MGD. Topics outlined include: original master plan alternative; original master plan water main improvements; hydraulic gradient with the original master plan alternative hydraulic gradient with the origin; existing pump and system curves; hydraulic modeling approach; key hydraulic findings of the original master plan alternative; key design challenges; alternative water system improvements; key elements of alternative; existing floor plan of Fort Ethan Allen Pumping Station; modified floor plan; interior photos prior to construction; new header wall penetration; and, exterior and interior construction photos. Includes figures.

Related Products

AWWA MTC61117

AWWA MTC61117

Performance of NF & RO Membranes on VOC Contaminated Groundwaters: Literature Summary and Pilot ..

$12.00 $24.00

AWWA WQTC62457

AWWA WQTC62457

Interlaboratory Validation of EPA Method 1103.1 (mTEC) for E. coli in Wastewater Effluent..

$12.00 $24.00

AWWA ACE63041

AWWA ACE63041

Storm Water Quality Basins Successes and Challenges: San Antonio, Texas..

$12.00 $24.00

AWWA JAW64476

AWWA JAW64476

Journal AWWA - Water Beat -- High Court Lets Stand NPDES Permit for Water Transfer..

$15.00 $30.00