• AWWA ACE65207
Provide PDF Format

Learn More

AWWA ACE65207

  • The Fluid-Crossing Gate for Pipeline Development and Application
  • Conference Proceeding by American Water Works Association, 06/01/2007
  • Publisher: AWWA

$12.00$24.00


This paper presents the development of a new method of water cut-off, addresses shortcomings of previously developed counter-measures, andminimizes cut-off area and time. The main features and considerations include: the ability toinsert and unfold its wing-like device to block the water flow;can be applied to large-diameter pipes and to pipes of various diameters with one device;minimizes working area (2-4m);simple and easy to insert into pipes;applicable in high pressure (up to 20 kg/cm<sup>2</sup>) pipes; and,minimum water cut-off time (less than 2 hours).Case studies of two existing facilities are profiled, and future plans are listed. Includes 4 references, tables, figures.

Related Products

AWWA ACE58272

AWWA ACE58272

Developing a Plan for Beneficial Use of Contaminated Groundwater - the City of Downey Plan..

$12.00 $24.00

AWWA ACE94217

AWWA ACE94217

Biological Filtration for Iron Removal..

$12.00 $24.00

AWWA ACE65568

AWWA ACE65568

Using Biomonitoring to Assess Human Exposure to Perchlorate..

$12.00 $24.00

AWWA ACE59904

AWWA ACE59904

Radon Removal for 50,000 pCi/L Wells..

$12.00 $24.00