• AWWA ACE65169
Provide PDF Format

Learn More

AWWA ACE65169

  • Reusing and Converting Existing Plant Infrastructure
  • Conference Proceeding by American Water Works Association, 06/01/2007
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation outlines an expansion project at the E.L. Smith Water Treatment Plant (WTP) inEdmonton, Alberta, Canada. Concept development included anumber of innovative ideas that would helpachieve the mandated capacity increase whilereusing parts of the existing process andconverting their function. The conceptual design for the current upgradeidentified the following criteria: expansion to increase net firm capacity to400 ML/d with the capacity to increase to 600 ML/din the future;provide reliability, redundancy, robustness and easeof operation and maintenance;reuse existing infrastructure as much as possible;increase raw water intake and pumping capacity; provide raw water feed to clarifier C3;increase clarification capacity by converting andreusing Clarifier C3 as a turbidity removal clarifier;increase hydraulic capacity;increase filtration capacity;increase disinfection capacity; and,increase chemical feed capacity. Further topics outlined include: raw water supply and pipeline; clarifiers; filters; and, chemical systems. Includes tables, figures.

Related Products

AWWA ACE58272

AWWA ACE58272

Developing a Plan for Beneficial Use of Contaminated Groundwater - the City of Downey Plan..

$12.00 $24.00

AWWA ACE94217

AWWA ACE94217

Biological Filtration for Iron Removal..

$12.00 $24.00

AWWA ACE65568

AWWA ACE65568

Using Biomonitoring to Assess Human Exposure to Perchlorate..

$12.00 $24.00

AWWA ACE59904

AWWA ACE59904

Radon Removal for 50,000 pCi/L Wells..

$12.00 $24.00