• AWWA ACE65106
Provide PDF Format

Learn More

AWWA ACE65106

  • It Meets the Spec... Really!!
  • Conference Proceeding by American Water Works Association, 06/01/2007
  • Publisher: AWWA

$12.00$24.00


This powerpoint presentation attempts to identify the problems associated with adding manufacturers after specifications have been developed, demonstrate how to modify a bad Bid Form, maintaining engineer and owner control, and present a real life project that the manufacturers got thrown under the bus and how it hurt the engineer in the long run. Recommendations include: have "me too" manufactures develop drawing and calculation submittal package to be evaluated prior to the bid; and, "want to be" named manufacturers should be required to review the specification line by line and make comments as to any discrepancies and explain the differences.

Related Products

AWWA ACE70865

AWWA ACE70865

Options for High-Efficiency Toilet Distribution..

$12.00 $24.00

AWWA MTC50252

AWWA MTC50252

Empirical Models for Predicting Permeate Flux Decline Due to Membrane Fouling by Natural Organic Mat..

$12.00 $24.00

AWWA ACE99346

AWWA ACE99346

Price Elasticity With Increasing Block Rates in Texas..

$12.00 $24.00

AWWA WQTC55139

AWWA WQTC55139

Development of a Rapid Molecular Detection Method for Toxoplasma gondii Oocysts..

$12.00 $24.00