• AWWA ACE65092
Provide PDF Format

Learn More

AWWA ACE65092

  • Using Risk and Criticality for Large-Diameter Pipeline Asset Management
  • Conference Proceeding by American Water Works Association, 06/01/2007
  • Publisher: AWWA

$12.00$24.00


This slide presentation outlines an effort to use risk and criticality for asset management of a large-diameter pipeline. The asset management continuous life cycle is presented first, along with the objectives of a large-diameter pipe assessmentprogram that include:failure prevention;which lines to inspect;frequency, technology, cost;which lines to protect;technology, cost, schedule; and,which lines to replace or rehabilitate;technology, cost, schedule. The presentation compares a large-diameter program vs. a small-diameter program. Risk assessment/management is presented in terms of likelihood of failure and consequences of failure. Further topics outlined include: program development for large mains; Examples of Pipe Classification forAssessment Plan Development; Elements of an Assessment Plan; Case Study - DWUInventory of Large Diameter Mains; Recommended Inspection TechniquesPCCP and Steel Pipe; Soil Sampling & Testing; Soil Characteristics; Prioritized 10-Year Program - 36-inch & Larger; Inspection Recommendations & Budgets; Small-diameter vs. Large-diameterBudget Recommendations (10-year average); and, lessons learned. Includes tables, figures.

Related Products

AWWA RSP64341

AWWA RSP64341

Chloramine Decay Rates at Pipe Surfaces and in Bulk Water in a Bench-scale Pipe Section Reactor..

$12.00 $24.00

AWWA JAW46261

AWWA JAW46261

Journal AWWA - Air Transfer Efficiency of Packed Saturators Used in DAF..

$15.00 $30.00

AWWA ACE60013

AWWA ACE60013

Development of an MF/UF Knowledge Base..

$12.00 $24.00

AWWA QTC98357

AWWA QTC98357

Selecting the Best Corrosion Control Strategy Using a New Rapid Corrosion Monitoring Tool..

$12.00 $24.00