Provide PDF Format
AWWA ACE65082
- Navigating Through Changing Times - Operations and Maintenance Planning for a New 363 ML/day OBM Plant
- Conference Proceeding by American Water Works Association, 06/01/2007
- Publisher: AWWA
$12.00$24.00
This slide presentation introduces the South Peel Water Supply System, outlines Ozone Biologically Activated Carbon Contactors and Membrane (OBM) plants and how they work, and describes management and planning strategies used for 363 ML/day OBM Capital Expansion related to staffing and development plan, maintenance planning, and minimizing construction impacts on existing and new operations. Includes tables, figures.
Related Products
AWWA RSP64341
Chloramine Decay Rates at Pipe Surfaces and in Bulk Water in a Bench-scale Pipe Section Reactor..
$12.00 $24.00
AWWA JAW46261
Journal AWWA - Air Transfer Efficiency of Packed Saturators Used in DAF..
$15.00 $30.00
AWWA QTC98357
Selecting the Best Corrosion Control Strategy Using a New Rapid Corrosion Monitoring Tool..
$12.00 $24.00