• AWWA ACE63162
Provide PDF Format

Learn More

AWWA ACE63162

  • Responding to the Immediate Requirements of the Stage 2 DBPR and LT2ESWTR
  • Conference Proceeding by American Water Works Association, 06/01/2006
  • Publisher: AWWA

$12.00$24.00


The Stage 2 Disinfection Byproduct Rule (DBPR) and the Long Term 2 Enhanced Surface WaterTreatment Rule (LT2ESWTR) were promulgated in the Federal Register on January 4, 2006, andJanuary 5, 2006, respectively. These rules have multiple urgent requirements, including therequirement for utilities to do an initial distribution system evaluation (IDSE), disinfectionbenchmarking, and source water monitoring. This paper focuses on the aspects of theseregulations that must be implemented early. Utility examples are used to illustrate the regulatoryrequirements. Includes tables, figure.

Related Products

AWWA JAW6784

AWWA JAW6784

Journal AWWA - Obtaining an Analytical Grasp of Water Distribution Systems ..

$15.00 $30.00

AWWA 65217

AWWA 65217

Safety First: Elevated Work Surfaces / Fall Protection..

$70.00 $140.00

AWWA JTMGT69635

AWWA JTMGT69635

'Round These Parts There's Only One Sheriff: Succession Planning the Greenville Way..

$12.00 $24.00

AWWA JTMGT57457

AWWA JTMGT57457

Knowledge Preservation for Tomorrow's Utility: The Utility Business and It's Unique Requirements..

$12.00 $24.00