AWWA ACE63096
- Integrated Water Infrastructure Master Planning for Dallas Water Utilities
- Conference Proceeding by American Water Works Association, 06/01/2006
- Publisher: AWWA
$12.00$24.00
This slide presentation outlines integrated water infrastructure master planning for Dallas Water Utilities (DWU). Project objectives included: prepare for future growth;reinvestment / renewal of existing infrastructure; and, GASB 34 Compliance. Topics outlined include: complexity of DWU; phased project approach designed toeffectively meet DWU's needs; model attributionand data sets; model calibration and results; pipeline assessment approach; rehab/replacement program; remaining life of existing infrastructure; and, distribution systemasset value evaluation. Includes tables, figures.
Related Products
AWWA ACE70712
The U.S. Water and Sanitation Foreign Assistance Program: Evolving through the Water for Poor Act..
$12.00 $24.00
AWWA ACE92231
Pumping System Optimization for Energy Conservation at the City of Tampa, Florida..
$12.00 $24.00