• AWWA ACE63043
Provide PDF Format

Learn More

AWWA ACE63043

  • The Air Up There: Impacts of Membrane Integrity Documentation Requirements on Multiple Stages of Membrane Implementation
  • Conference Proceeding by American Water Works Association, 06/01/2006
  • Publisher: AWWA

$12.00$24.00


The City of Minneapolis membrane ultrafiltration program is in the unique position of starting up onefull-scale plant and procuring membranes for a second plant within the context of the draft Long Term 2 Enhanced Surface Water Treatment Rule.Minneapolis procured the membranes for its first 70-MGD ultrafiltration plant in 2001. At that time,membranes were considered by the State of Minnesota to be an Alternative Filtration Technology. Basedon the results of the 7-month pilot testing program, the State of Minnesota granted the plant 4-logremoval for Cryptosporidium, Giardia, and viruses. A turbidity performance requirement was alsospecified by the State. As the project moved through construction in 2004, the State indicated theregulatory reporting requirements for the full scale plant should be consistent with the newly-issued DraftLong Term Enhanced Surface Water Treatment Rule and associated Membrane Filtration GuidanceManual. Through a team effort between the City, its consulting engineer, and the equipment supplier,requirements of the draft rule were successfully incorporated into the control and monitoring of the fullscaleplant.In 2004-2005, while the 70-MGD plant was moving through the final stages of construction intocommissioning and start-up, the City was procuring membranes for a second, 95-MGD membrane plant.The City focused on incorporating lessons learned from the actual implementation of the new regulatoryframework into the procurement of the membranes for its second plant.This paper presents the audience with lessons learned when procuring, piloting, designing, andoperating membrane plants under the integrity requirements of the new rule. Details are presentedregarding what utilities and regulators should consider in preparing contract documents, what should bedemonstrated during pilot testing, and how to ensure accurate scale-up and implementation in a full-scaleplant. Includes 2 references, figure.

Related Products

AWWA MTC61178

AWWA MTC61178

Membrane Bioreactor for Pilot Studies in the Arctic Alaska..

$12.00 $24.00

AWWA ACE70712

AWWA ACE70712

The U.S. Water and Sanitation Foreign Assistance Program: Evolving through the Water for Poor Act..

$12.00 $24.00

AWWA ACE94074

AWWA ACE94074

Gaining Public Acceptance of Rate Increases..

$12.00 $24.00

AWWA ACE92231

AWWA ACE92231

Pumping System Optimization for Energy Conservation at the City of Tampa, Florida..

$12.00 $24.00