  • Groundwater Recovery Facility Design-Build-Operate: DBO Success and Lessons Learned
  • Conference Proceeding by American Water Works Association, 06/17/2005
  • Publisher: AWWA

$12.00$24.00


This slide presentation outlines information on a design-build-operate (DBO) project delivery approach taken by the City of San Juan Capistrano to build a groundwater recovery facility. Topics covered include: qualifications process; proposal process; DBO service agreement; transaction structure; current status of project; and, lessons learned.

Related Products

AWWA JAW61555

AWWA JAW61555

Journal AWWA - Hydraulic Transient Guidelines for Protecting Water Distribution Systems..

$15.00 $30.00

AWWA ACE54530

AWWA ACE54530

Remote Monitoring and Operation of Isolated Facilities in Cold Regions..

$12.00 $24.00

AWWA MTC57634

AWWA MTC57634

Membrane Bioreactor Pilot Testing at Reduced SRT for King County, WA..

$12.00 $24.00

AWWA WQTC50415

AWWA WQTC50415

Pathogen Intrusion Into the Distribution System..

$12.00 $24.00