• AWWA ACE56171
Provide PDF Format

Learn More

AWWA ACE56171

  • Process Selection, Design and Equipment Selection Under Design-Build-Operate Constraints
  • Conference Proceeding by American Water Works Association, 06/16/2002
  • Publisher: AWWA

$12.00$24.00


Using the Tampa Bay Water Surface Water Treatment Plant Component (SWTP) procured under a DBP approach as a case study, pragmatic solutions are presented in this paper for the analysis and response to issues relating to process, design, and equipment selection approaches that occur when the operator, constructor, and engineer are separate entities. The SWTP will be a 66-mgd facility and will serve as the backbone of Tampa Bay Water's future water supply system serving the fast-growing, yet water resource-limited Tampa Bay area. The SWTP will employ multiple unit processes including high-rate sedimentation, ozonation for primary disinfection, biologically active filtration, and numerous chemical additions that present a magnitude of alternative approaches. The contractual agreements include water quality standards far stricter than current Primary and Secondary Drinking Water Standards with strict monetary penalties for non-compliance.

Related Products

AWWA MTC64571

AWWA MTC64571

The Englewood, Florida, Brackish Water RO Desalting Plant - 25 Years of Innovation..

$12.00 $24.00

AWWA ACE99552

AWWA ACE99552

Enhancing an Industrial Water Supply Through Creative Water Supply Planning..

$12.00 $24.00

AWWA JAW30353

AWWA JAW30353

Journal AWWA - Contamination of Potable Water by Permeation of Plastic Pipe..

$15.00 $30.00

AWWA ACE71064

AWWA ACE71064

Formation and Stability of Solid Phase Lead Corrosion Products..

$12.00 $24.00