• AWWA ACE54484
Provide PDF Format

Learn More

AWWA ACE54484

  • From Proprietary Water Plant DCS to Open Architechture System: The Benefits of an Evolutionary Approach
  • Conference Proceeding by American Water Works Association, 06/01/2001
  • Publisher: AWWA

$12.00$24.00


In January, 1999 Contra Costa Water District embarked upon a major project to upgrade the distributed control system (DCS) at their 40 million gallongs per day Randall-Bold Water Treatment Plant in Oakley, California. The upgrade was driven by limited DCS expansion capability, obsolescence of 1980s era components, diminishing support, and Year 2000 compliance issues. Phase One of the upgrade included the replacement of proprietary operator interface hardware and software with open system components and networks. The most significant challenge was to complete the project without interrupting operations. Due to time and budget constraints, the project was structured in a "design/build" format with no detailed contract documents and no formal submittals required. The first phase of the DCS upgrade project was completed and several key objectives were achieved with no plant shutdowns. Follow-up projects are planned and similar techniques will be employed to accelerate project completion with minimal disruption to plant operations. Includes figures.

Related Products

AWWA 51763

AWWA 51763

Microbial Concerns in Distribution Systems..

$12.00 $24.00

AWWA ACE91076

AWWA ACE91076

Inactivation of Adult Zebra Mussels by Chlorine..

$12.00 $24.00

AWWA ACE70502

AWWA ACE70502

AWWA Workforce Program Implementation: Next Steps..

$12.00 $24.00

AWWA WQTC58882

AWWA WQTC58882

Advanced Oxidation Processes for the Treatment of Candidate Contaminant List (CCL) Chemicals..

$12.00 $24.00