• AWWA ACE54253
Provide PDF Format

Learn More

AWWA ACE54253

  • Treatment of MTBE for One of Dallas' Largest Surface Water Supplies
  • Conference Proceeding by American Water Works Association, 06/01/2001
  • Publisher: AWWA

$12.00$24.00


On March 10, 2000 approximately 500,000 gallons of gasoline spilled into East Caddo Creek, which feeds into Lake Tawakoni. The gasoline spill resulted in elevated levels of the gasoline additive methyl tertiary butyl ether (MTBE) in Lake Tawakoni. Lake Tawakoni is one of the two surface water sources that serves the City of Dallas,Texas East Side Water Treatment Plant (WTP). As a result of the gasoline spill, the City of Dallas and their consultant, Camp Dresser & McKee Inc. (CDM), conducted bench-scale studies to evaluate various treatment technologies for the removal of MTBE including: aeration; granular activated carbon; ozone/hydrogen peroxide; and, ultraviolet radiation/hydrogen peroxide. This paper provides the results of the bench-scale studies. Includes 2 references, tables, figures.

Related Products

AWWA QTC97023

AWWA QTC97023

Pilot-Plant Trials on the Removal of Arsenic From Potable Water Using Activated Alumina..

$12.00 $24.00

AWWA ACE60081

AWWA ACE60081

What's the Right Amount to Spend on Security Improvements?..

$12.00 $24.00

AWWA MTC53891

AWWA MTC53891

Fitting MF/UF Technologies to Application Rather Than Application to MF/UF Systems..

$12.00 $24.00

AWWA ACE70485

AWWA ACE70485

Energy Action Plan for Ocean County Utilities Authority..

$12.00 $24.00